Custom Water Bottle Manufacturer in Dongguan, China

Custom water bottle production runs from two workshops: steel bodies are drawn, welded and vacuum-tested in Dongguan, silicone is moulded on the same site. The plant holds 180+ moulds, employs 150+ workers and ships 500,000 pieces a month. Minimum order is 500 pieces per style, sampling takes 7 to 10 days, and production runs 15 to 20 days after you approve the sample.

Manufacturing capability

Drawn and moulded in Dongguan, packed for export

A bottle body begins as a 304 stainless steel disc drawn into a cup, then drawn a second time to form the shoulder. The neck is spun and the thread rolled into the wall instead of cut into it, so the lid seats without a burr and the rim stays square. Each body is pressure-tested before coating, because a leaking weld shows up later as a bubble under the powder coat.

Silicone bodies and PP lids are moulded in the Dongguan workshop, on the same order and in the same carton as the steel bottles when a range mixes both. Decoration splits by artwork: silk-screen and UV printing carry flat colours, laser engraving leaves a mark that cannot rub off, and water-transfer or heat transfer wraps artwork around a curved body. Cartons hold 40 to 60 pieces depending on the model, in 5-ply board.

  • MOQ 500 pcs per style in stock colours
  • Sampling 7–10 days, production 15–20 days
  • FOB Shenzhen or Yantian, T/T 30/70
See steel and silicone grades
Drawn 304 stainless steel bottle bodies moving along a workshop bench
In-house operations

Where the price and the date actually come from

Three operations decide your per-piece price and your delivery date, and each one sits on our own floor rather than at a subcontractor.

Body drawing and welding

A 304 or 316L disc is drawn into a body, the base welded, the neck spun and the thread rolled. Double-wall units are vacuum-tested before the powder coat goes on.

Lid, seal and silicone moulding

PP lids, food-grade silicone seals and collapsible silicone bodies are moulded in the Dongguan workshop, so a cap and its bottle leave on one packing list.

Print, pack and inspect

Silk-screen, UV printing, laser engraving and water-transfer wraps run in-house, then the bottle is bagged, boxed or sleeved and cartoned in 5-ply board.

Tooling and terms

What a new mould costs, and who owns it

Tooling is the only line on a quotation a buyer can avoid. More than 180 moulds sit on the rack, and a bottle that matches one of them costs nothing to start. A new shell or body mould is US$400 to US$1,200, cut in 15 to 20 days, and it is invoiced once and recorded as yours, so a reorder never pays for it again.

Payment is 30% deposit and 70% against the pre-shipment inspection report, by T/T. The inspection runs to AQL 2.5 with a photo report before the container leaves, so the balance is released against evidence rather than a promise. Published FOB prices sit at US$2.63 to US$8.70 per piece, with 6% off at 500 pieces, 10% at 1,000 and 15% at 3,000.

  • Tooling US$400–1,200, 15–20 days, tool stays yours
  • AQL 2.5 pre-shipment, photo report before loading
  • US$2.63–$8.70 per piece, −6% from 500 pcs
Request tooling costs
Steel body mould clamped in a press with a drawn bottle shell beside it
Order data

The numbers behind a quotation

Every figure below is the one we quote against, not an average across the range.

Minimum order
500 pcs per style in stock colours; 1,000 pcs for a custom Pantone and logo
Sampling
7–10 days; 3–5 days for a stock sample
Production
15–20 days after sample approval
Tooling
US$400–1,200 per new shell or body mould, 15–20 days, tool stays yours
Capacity
500,000 pcs per month from 150+ workers
Carton
40–60 pcs per 5-ply export carton, model dependent
Inspection
AQL 2.5 pre-shipment, photo report before the container leaves
Payment
30% deposit, 70% against the inspection report, T/T
Delivery terms
FOB Shenzhen or Yantian
Price band
US$2.63–$8.70 per piece before volume discount
Inside the plant

The line the bottles come off

Four frames from the plant: moulding, storage, the laboratory and the production hall.

Buyer questions

Questions that come up before a purchase order

Lids, copying an existing bottle, carton counts and call-off stock.

Do you make the lid as well as the bottle?
Yes. PP lids, food-grade silicone seals and collapsible silicone bodies are moulded in the Dongguan workshop and matched to steel bodies drawn alongside. Both arrive in one carton with one packing list.
Can you quote a bottle that is not on your mould list?
Only with a new tool. A body mould costs US$400 to US$1,200 and takes 15 to 20 days, and it stays yours. Where a similar mould exists we quote your drawing against it first.
How do you copy a bottle we already buy?
Send one bottle. We cut it open, measure the wall at the base, shoulder and neck, confirm the steel grade and the lid thread, then say whether a stock mould matches or a tool is needed.
How many bottles go into a carton?
40 to 60 pieces depending on the model, in a 5-ply export carton. The carton is weighed and marked before the container is loaded, and the count appears on the packing list.
Can you hold stock for a call-off schedule?
The plant runs 500,000 pieces a month with 150+ workers, so a monthly release against a rolling forecast is normal. Stock is held against your forecast and released on your call-off.

Ready to price your next water bottle order?

Send your specification, quantity and target market. We reply with a quotation, a sampling date and the carton count within 12 working hours.